September 25, 2018
Colman Dock: Vehicle holding locations move September 26th
Vehicle holding locations move for first time in decades
Starting Wednesday, Sept. 26, the Bainbridge Island vehicle holding lanes and loading slip will move to the south side of the terminal building where Bremerton vehicles currently wait. The Bremerton lanes and slip will shift to the north side where Bainbridge vehicles currently wait. This swap has not occurred in nearly 30 years, however doing so now will maximize room on the dock and eliminate loading conflicts between destinations as crews prepare to expand the construction zone this fall.